So, few days before stepping the mast I had to place all the new rigging (stays and ropes) plus the new antenna (vhf) and the vindex. Also I have installed a new shackle for the boom topping lift oversized as it will be also used to lift the engine during the shaft alignment works.
Also the new stainless steel tabernacle has been placed and the wooden step prepared.
Mizar has been standing at a buoy for 5 years. Now it's time to get her back on shape.
Subscribe to:
Post Comments (Atom)
Finally the hull is dry - It's Epoxy time
When I have started this project (september '17) I thought i was going to be sailing in March. well...that was not the case. it's b...
-
As usual a big concern was how good are the current through hulls? On the contest 29 these were melted into resin I guess as it gives stre...
-
Since its launch in 1972 Mizar had 2 engines mounted. the original from the conyplex shipyard was a Volvo MD2B 18hp which history I don'...
-
So, few days before stepping the mast I had to place all the new rigging (stays and ropes) plus the new antenna (vhf) and the vindex. Also I...
No comments:
Post a Comment