Also the new stainless steel tabernacle has been placed and the wooden step prepared.
Mizar has been standing at a buoy for 5 years. Now it's time to get her back on shape.
New rigging, vhf antenna and windex
So, few days before stepping the mast I had to place all the new rigging (stays and ropes) plus the new antenna (vhf) and the vindex. Also I have installed a new shackle for the boom topping lift oversized as it will be also used to lift the engine during the shaft alignment works.
Also the new stainless steel tabernacle has been placed and the wooden step prepared.

Also the new stainless steel tabernacle has been placed and the wooden step prepared.
Subscribe to:
Post Comments (Atom)
Finally the hull is dry - It's Epoxy time
When I have started this project (september '17) I thought i was going to be sailing in March. well...that was not the case. it's b...
-
As usual a big concern was how good are the current through hulls? On the contest 29 these were melted into resin I guess as it gives stre...
-
Having to instal a different inboard engine I had to take a lot of measures and adapt the rails so that the new (1972) engine could be place...
-
So, few days before stepping the mast I had to place all the new rigging (stays and ropes) plus the new antenna (vhf) and the vindex. Also I...
No comments:
Post a Comment